Skip to content
Technical Certificate of Analysis (CoA) issued with every shipment
Compliant with UN specifications for transporting hazardous materials, and certified to ISO 9001:2015

Rigorous Engineering Quality Standards: Uncompromising Safety in Packaging and Chemical Transport

In the chemical, fertilizer, and pesticide industries, any defect in the container wall or cap torque can cause severe environmental and commercial losses. Elhamd Factory therefore applies a three-stage laboratory control system in which every production batch undergoes 5 rigorous stress tests before leaving the factory warehouses.

Illustrative view of the testing and quality control environment
Illustrative view of the testing and quality control environment
DROP TEST
1.8 m

Free-Fall Drop Test

Withstands base and corner impacts at -18°C without fracture

PRESSURE
250 kPa

Internal Hydraulic Pressure

Withstands vapor expansion up to 2.5 bar with complete stability

ACCREDITED
UN 3H1

United Nations Certification

International approval for transporting and exporting hazardous goods and pesticides

STANDARD
ISO 9001

Total Quality Management

Accurate barcode-based digital tracking for every shipment leaving the factory

Physical and Mechanical Testing Protocols

6 Rigorous Laboratory Tests to Ensure Container and Jerrican Performance

These tests are conducted in the factory’s attached quality laboratory in accordance with UN 6.1 and ASTM international specifications to monitor polymer formation and test their resistance to the harshest handling conditions:

DROP IMPACT
1.8m @ -18°C

United Nations Free-Fall Drop Test

Tests the resilience of the filled container after freezing on different corners.

PRESSURE
250 kPa

Internal Hydrostatic Pressure Test

Wall resistance under continuous internal hydraulic pressure for 30 minutes.

STACKING
4 Tiers

Vertical Stacking and Load Test

Loading multiplied weights to simulate stacking 4 tiers for 28 days at 40°C.

LEAKPROOF
30 kPa

Vacuum Leak and Cap Tightness Test

Water immersion under vacuum to ensure no gas bubbles escape.

ESCR RATING
> 1000h

Environmental Stress Crack Resistance Test

Exposing the container to active solvents and thermal stress to prevent microscopic cracks.

COMPATIBILITY
100% Virgin

Chemical Compatibility & Zero Paneling

Measuring polymer interaction with organic materials and acids to prevent wall paneling.

Industrial Control and Traceability Chain

3 Mandatory Inspection Stations Before Delivering the Shipment to the Customer

S1

Incoming Raw Material Inspection

Analyzing certificates of origin and testing the melt flow index (MFI) and density of virgin polymer pellets from major global refineries (SABIC / QAPCO). Any recycled raw materials are strictly prohibited from entering production lines.

✓ 100% pure virgin raw materials
S2

Live Control During Forming

Continuous thermal and pressure monitoring of automatic blow molding machines (EBM), with hourly sample draws to measure jerrican net-weight stability, wall thickness, and neck finish quality, ensuring compatibility with your automated filling machines.

✓ Zero grammage deviation
S3

Final Inspection and Approval

Inspecting random samples from every carton or pallet ready for shipment to verify seal tightness, cap torque, and complete internal cleanliness, and issuing the approved laboratory certificate of analysis (CoA) signed by the Quality Manager.

✓ Approved certificate of analysis issued
Live Documentation from the Production Floor

Mechanical Inspection System and Automated Forming at Elhamd Factory

See the actual production and automatic blow-molding lines, where every container and jerrican directly undergoes tightness, weight-stability, and neck-adjustment tests.

Automatic blow-molding production lines and smart conveyors
100% direct leak inspection EBM Production Line

Continuous Automated Production and Filling Lines

Integrated robotic handling moves containers and jerricans across smart conveyors, with direct detection of any forming defects or weight deviations before packaging and storage.

Industrial blow-molding machine and jerrican mold cavity
Precise Parison Calibration Industrial CNC Mold

Industrial Blow Molding Machines and Steel Forming Molds

Superior forming precision in steel molds ensures uniform wall-thickness distribution and resistance to buckling under high stacking loads.

Technical Support and Quality Control Service for Factories

Request a Laboratory Inspection Certificate (CoA) and Samples for Production Line Testing

We are pleased to provide quality and procurement departments with all laboratory test results for jerrican and container samples and their compliance with your factory’s specific specifications before contracting.

Select from the factory catalog

Select the exact model. Closure fit, material, samples and supply are confirmed by the factory.

⚡ Certificate of analysis requests are recorded and official reports are sent via Sales and Quality Management at 010 0513 0714

Language:

AR EN
Display mode: Light / dark